Owner’s project requirements (OPR) for facilities

The owner’s project requirements (OPR) for Vancouver Coastal Health (VCH) are design requirements for consultants involved in designing projects for VCH facilities.

Architects, engineers and consultants designing projects for construction at VCH facilities must comply with the OPR.  Any exceptions or deviations from the OPR must be reviewed and approved by VCH’s Facilities Capital Projects department in consultation with Facilities Maintenance and Operations (FMO).

The OPR provides owner-specific minimum baseline requirements above and beyond codes and standards.

Note: The OPR is updated periodically.  Please download the latest version

Supporting documents

    • Ambulance Emergency Drop-off Design Guidelines

    • Asset Data Collection Requirements

    • CCDC Master Specification – Division 01

    • Climate Resilience Guidelines for BC Health Facility Planning and Design

    • Communications Infrastructure Standards and Specifications

    • Controlled Pressure Test Sheet

    • Electronic Security System Standards

    • Electrical Service Information Form

    • Elevator Technical Guidelines and Requirements

    • Faucet and Sink Combinations

      These guidelines should be used to support the selection process of a faucet and sink design for each hand hygiene sink location in all types of health-care facilities.

    • FGI Guidelines for Design and Construction of Hospitals

      Guidelines for Design and Construction of Residential Health, Care, and Support Facilities, Guidelines for Design and Construction of Hospitals, Guidelines for Design and Construction of Outpatient Facilities

    • FSS Drawing Standards and Requirements

    • HMI Display Standard

    • HVAC Standard Documentation for New Construction and Renovation Project

    • HVAC Standards for Building Automation, Instrumentation and Controls

    • IPS Bike Facility Design Guideline

    • Long Term Care Design Guidelines

    • Low Carbon Resilience and Environmental Sustainability Guidelines for Health Care New Construction

    • Regional Electric Vehicle Charging Station Framework

    • Regional Electric Vehicle Charging Station Framework

      Appendix F: EV-Charging LMHO Design Specifications

    • Regional Electric Vehicle Charging Station Framework

      Appendix G: EV Charger Performance Specification

    • Sensor and Actuator Calibration Sheet

    • Vancouver General Hospital – Interior Signage Specification Guide