Owner’s Project Requirements (OPR) for facilities

The Owner’s Project Requirements (OPR) for Vancouver Coastal Health (VCH) are design requirements for consultants involved in designing projects for VCH facilities.

Architects, engineers and consultants designing projects for construction at VCH facilities must comply with the OPR.  Any exceptions or deviations from the OPR must be reviewed and approved by VCH’s Facilities Capital Projects department in consultation with Facilities Maintenance and Operations (FMO).

The OPR provides owner-specific minimum baseline requirements above and beyond codes and standards.

Note: The OPR is updated periodically.  Please download the latest version

Supporting documents

    • Asset Data Collection Requirements - VCH FMO

    • Climate Resilience Guidelines for BC Health Facility Planning and Design

    • Communications infrastructure standards and specifications

    • Controlled Pressure Test Sheet - VCH FMO

    • Design Requirements for Ambulance Emergency Drop-Off Bay

    • Division 01 guide

    • Electronic Security System Standards - VCH Protection Services

    • Electrical Service Information Form - VCH PMO Guide

    • Elevator Technical Guidelines and Requirements - VCH Facilities Management

    • FGI Guidelines for Design and Construction (2022)

      Guidelines for Design and Construction of Residential Health, Care, and Support Facilities, Guidelines for Design and Construction of Hospitals, Guidelines for Design and Construction of Outpatient Facilities

    • HMI Display Standard - VCH FMO

    • HVAC Standard Documentation for New Construction and Renovation Project

    • HVAC Standards for Building Automation, Instrumentation and Controls

    • IPS Bike Facility Design Guideline

    • Long Term Care Design Guidelines

    • Low Carbon Resilience and Environmental Sustainability Guidelines for Health Care New Construction

    • Sensor and Actuator Calibration Sheet

    • Vancouver General Hospital (VGH) Interior Signage Guidelines